Tidewater Crossing Outfall project

4 Documents in Project

Summary

SCH Number
2005122101
Lead Agency
Stockton, City of (City of Stockton)
Document Title
Tidewater Crossing Outfall project
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes excavating approximately 10 cubic yards of soil from the dry bed of the stream channel, and excavated 10 cubic yards of rock slope protection into the stream channel. An additional 68 cubic yards of soil will be excavated from the banks of the stream channel above the ordinary high-water mark, and 68 cubic yards of rock slope protection will be placed along the banks of the stream channel above the OHWM. Above the rock slope protection and OHWM, a 24-inch diameter outfall will be installed in the upper bank of the stream channel for conveying storm water flows from the detention basin pump station of the adjacent property

Contact Information
Nicholas White
Central Valley Regional Water Quality Control Board
10020 Sun center dr
Rancho Cordova, CA 95670

916-464-4856

Location

Coordinates
37.888347°'"N 121.256439°'"W
Cities
Stockton
Counties
San Joaquin
Cross Streets
French Camp Road, Airport Way, UPRR
Zip
95231
Total Acres
878
Parcel #
177-050-05, 08, 09, 25; 177-100-02, 03, 07; 177-110-04, 05; 201-020-01
State Highways
I-5, 99
Railways
UPRR
Airports
Stockton Metropolitan
Schools
French Camp Elementary School (Manteca Unified)
Waterways
French Camp Slough
Township
1S
Range
7E
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search