Tidewater Crossing Outfall project
9 Documents in Project
Summary
SCH Number
2005122101
Lead Agency
City of Stockton
Document Title
Tidewater Crossing Outfall project
Document Type
NOD - Notice of Determination
Received
Posted
9/13/2018
Present Land Use
Inustrial: AU-20/ Industrial: Limited Industrial/ Agriculture: AU-20/ Agriculture: AG-40
Document Description
The project includes excavating approximately 10 cubic yards of soil from the dry bed of the stream channel, and excavated 10 cubic yards of rock slope protection into the stream channel. An additional 68 cubic yards of soil will be excavated from the banks of the stream channel above the ordinary high-water mark, and 68 cubic yards of rock slope protection will be placed along the banks of the stream channel above the OHWM. Above the rock slope protection and OHWM, a 24-inch diameter outfall will be installed in the upper bank of the stream channel for conveying storm water flows from the detention basin pump station of the adjacent property
Contact Information
Name
Nicholas White
Agency Name
Central Valley Regional Water Quality Control Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Stockton
Counties
San Joaquin
Cross Streets
French Camp Road, Airport Way, UPRR
Zip
95231
Total Acres
878
Parcel #
177-050-05, 08, 09, 25; 177-100-02, 03, 07; 177-110-04, 05; 201-020-01
State Highways
I-5, 99
Railways
UPRR
Airports
Stockton Metropolitan
Schools
French Camp Elementary School (Manteca Unified)
Waterways
French Camp Slough
Township
1S
Range
7E
Base
MDB&M
Notice of Determination
Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.