SCH Number 1999044004
Project Info
- Title
- Tule River Basin Investigation / Success Lake Capacity Expansion NOD
- Description
- This document was prepared as a Supplemental EIR to the 1999 FEIR/FEIS for the Project. The Project consists of constructing a 10 foot-high concrete ogee weir across the Lake Success spillway, which would raise the maximum gross pool elevation from 655.1 feet to 665.1 feet. This would add approximately 28,000 acre-feet ofjoint-use flood control and irrigation water storage space in the reservoir, increasing storage capacity from 82,300 to 110,300 acre- feet. The reservoir surface area would increase from 2,400 to 3,120 acres. As part of the Project, Southern CA Edison will replace/raise transmission towers over the lake and will replace/relocate some distribution lines around the lake.
7 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Lower Tule River Irrigation District | Lake Success Transmission Project (Lake Alteration Agreement No. EPIMS-TUL-17913-R4) | |
NOD | Lower Tule River Irrigation District | Tule River Basin Investigation / Success Lake Capacity Expansion NOD | |
SIR | Lower Tule River Irrigation District | Tule River Basin Investigation / Success Lake Capacity Expansion | |
NOP | Lower Tule River Irrigation District | Tule River Basin Investigation / Success Lake Capacity Expansion | |
NOD | United States Army, Army Corps of Engineers (USACE) | Success Reservoir Enlargement | |
FIN | United States Army, Army Corps of Engineers (USACE) | Tule River Basin Investigation, California, Draft EIR/EIS | |
EIR | United States Army, Army Corps of Engineers (USACE) | Tule River Basin Investigation, California, Draft EIR/EIS |