Hartley Street Pedestrian Improvement Project
2 Documents in Project
Summary
SCH Number
2019079091
Lead Agency
City of Lakeport
Document Title
Hartley Street Pedestrian Improvement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
N/A (project would occur within City's right-of-way; however, surrounding area is predominately low- to medium-density residential)
Document Description
Under the project, an approximately 2,800-foot-long portion of Hartley Street (CR #408), a two-lane collector street, would be widened to provide two 12-foot travel lanes, one in each direction. Additionally, as part of the project, continuous sidewalks would be installed along the same portion of Hartley Street, along the west side. Existing portions of sidewalk along Hartley Street would remain; however, noncompliant ramps would be replaced to meet ADA standards. The concrete gutter along the west side of Hartley Street would be included in the 12-foot lane width of the southerly travel lane. An approximately 200-foot-long span of Hartley Street, within the very northern portion of the Site, would be repaved only. Due to the area's steep hillsides and current inadequate width for sidewalk and roadway, retaining walls and/or structures would be required as part of the project. Furthermore. ancillary work associated with the project would involve installation of safety fencing to protect and prevent In addition to the proposed improvements, existing power poles and fire hydrants and relief valves may need to be relocated behind the new continuous sidewalk. New storm drain inlets and improvements to existing culverts may also be required. due to the anticipated change in drainage patterns associated with the sidewalk, curb, and gutter installation and roadway widening. An ADA-compliant accessible ramp down to Clear Lake High School. adjacent to the existing crosswalk and concrete stairs along the east side of Hartley Street at Anastasia Drive, would also be installed.
Contact Information
Name
Olivia Grupp
Agency Name
City of Lakeport Public Works Department
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
City of Lakeport
Contact Types
Project Applicant
Location
Coordinates
Cities
Lakeport
Counties
Lake
Cross Streets
Hartley Street, from approximately 200 feet north Anastasia Drive, south to 20th Street
Zip
95453
Total Acres
~3
State Highways
29
Schools
Clear Lake High, Terrace Middle School, Lakeport Elementary
Waterways
Clear Lake
Township
14N
Range
10W
Section
13
Base
MD
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 1 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), Department of Toxic Substances Control, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Other (Hartley Street (existing roadway))
Local Actions
roadway widening and sidewalk installation
Project Issues
Air Quality, Biological Resources, Hazards & Hazardous Materials, Noise, Vegetation, Wetland/Riparian, Cultural Resources
Attachments
Environmental Document
NOC
State Comments
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.