Document Description
Under the project, an approximately 2,800-foot-long portion of Hartley Street (CR #408), a two-lane collector street, would be widened to provide two 12-foot travel lanes, one in each direction. Additionally, as part of the project, continuous sidewalks would be installed along the same portion of Hartley Street, along the west side. Existing portions of sidewalk along Hartley Street would remain; however, noncompliant ramps would be replaced to meet ADA standards. The concrete gutter along the west side of Hartley Street would be included in the 12-foot lane width of the southerly travel lane. An approximately 200-foot-long span of Hartley Street, within the very northern portion of the Site, would be repaved only. Due to the area's steep hillsides and current inadequate width for sidewalk and roadway, retaining walls and/or structures would be required as part of the project. Furthermore. ancillary work associated with the project would involve installation of safety fencing to protect and prevent In addition to the proposed improvements, existing power poles and fire hydrants and relief valves may need to be relocated behind the new continuous sidewalk. New storm drain inlets and improvements to existing culverts may also be required. due to the anticipated change in drainage patterns associated with the sidewalk, curb, and gutter installation and roadway widening. An ADA-compliant accessible ramp down to Clear Lake High School. adjacent to the existing crosswalk and concrete stairs along the east side of Hartley Street at Anastasia Drive, would also be installed.

Contact Information
Olivia Grupp
City of Lakeport Public Works Department
225 Park Street
Lakeport, CA 95453

Phone : (707) 263-3578

Location

Coordinates
39°03'37.29"N 122°55'17.76"W
Cities
Lakeport
Counties
Lake
Cross Streets
Hartley Street, from approximately 200 feet north Anastasia Drive, south to 20th Street
Zip
95453
Total Acres
~3
State Highways
29
Schools
Clear Lake High, Terrace Middle School, Lakeport Elementary
Waterways
Clear Lake
Township
14N
Range
10W
Section
13
Base
MD

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Hartley Street (existing roadway))
Local Action
roadway widening and sidewalk installation
Project Issues
Air Quality Biological Resources Noise Toxic/Hazardous Vegetation Wetland/Riparian Cultural Resources
Reviewing Agencies
Air Resources Board, Transportation Projects California Department of Parks and Recreation California Highway Patrol Caltrans, District 1 Department of Fish and Wildlife, Region 2 Department of Toxic Substances Control Native American Heritage Commission Resources Agency State Water Resources Control Board, Division of Water Quality Regional Water Quality Control Bd., Region 5 (Sacramento)

Attachments

Environmental Document
7184   PDF 10222 K Appendix A-MMRP   PDF 36 K Appendix B-Road Constructions Emissions Model Results   PDF 376 K Appendix C-Hartley Street Biological Survey 20190617   PDF 5187 K Appendix D-Cultural Resources Correspondence   PDF 1986 K Fig 1_Location Map   PDF 1475 K Fig 2_City of Lakeport GP Designations Map   PDF 257 K Fig 3_City of Lakeport Zoning Map   PDF 234 K Summary Form   PDF 86 K
NOC
NOC   PDF 1610 K
State Comments
2019079091 RWQCB   PDF 1168 K
Download CSV New Search