SCH Number 2024070644


Project Info

Title
Integrated Science and Engineering Building Project
Description
California State University, San Marcos is proposing to construct an Integrated Science and Engineering Building project with a combined 125,000 square feet on a 2.46-acre site and an approximately 750-foot-long off-site utility tunnel on an additional 0.17 acre within the existing campus (proposed project). The proposed project would provide state of the art facilities for teaching, learning, and research, featuring integrative innovative technology and flexible configurations for classrooms and laboratories. The proposed project would require re-routing an existing service road and underground utilities. Other on-site improvements would include a loading dock and freight elevator, landscaping, exterior lighting, building and wayfinding signage, fire lane access, fire hydrants, and access for trash collection. The proposed project would be constructed in separate phases. Once operational, the proposed project would support new College of Science, Technology, Engineering, and Mathematics undergraduate programs on campus. The proposed project is anticipated to result in approximately 350 new students (i.e., students not currently enrolled) and 33 new staff and faculty in the opening year.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
California State University, San Marcos (CSUSM) Integrated Science and Engineering Building Project
California State University, San Marcos (CSUSM) Integrated Science and Engineering Building Project