Integrated Science and Engineering Building Project

2 Documents in Project

Summary

SCH Number
2024070644
Lead Agency
California State University, San Marcos (CSUSM)
Document Title
Integrated Science and Engineering Building Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Institutional/Public Land (P-1)
Document Description
California State University, San Marcos is proposing to construct an Integrated Science and Engineering Building project with a combined 125,000 square feet on a 2.46-acre site and an approximately 750-foot-long off-site utility tunnel on an additional 0.17 acre within the existing campus (proposed project). The proposed project would provide state of the art facilities for teaching, learning, and research, featuring integrative innovative technology and flexible configurations for classrooms and laboratories. The proposed project would require re-routing an existing service road and underground utilities. Other on-site improvements would include a loading dock and freight elevator, landscaping, exterior lighting, building and wayfinding signage, fire lane access, fire hydrants, and access for trash collection. The proposed project would be constructed in separate phases. Once operational, the proposed project would support new College of Science, Technology, Engineering, and Mathematics undergraduate programs on campus. The proposed project is anticipated to result in approximately 350 new students (i.e., students not currently enrolled) and 33 new staff and faculty in the opening year.

Contact Information

Name
Michelle Alves
Agency Name
California State University, San Marcos
Job Title
Campus Planner
Contact Types
Lead/Public Agency

Name
Eric Ruby
Agency Name
Ascent
Job Title
Principal
Contact Types
Consulting Firm

Location

Cities
San Marcos
Counties
San Diego
Regions
Citywide
Cross Streets
Craven Road/Palm Canyon Drive and Campus View Drive/La Moree Road
Zip
92096
Total Acres
2.63
Jobs
33
Parcel #
221-67-002 and 221-67-003
State Highways
SR 78, I-15
Railways
SPRINTER
Airports
None
Schools
San Marcos Elementary and others
Waterways
San Marcos Creek, Discovery Lake, South Lake, Jack's Pond
Township
12S
Range
3W
Section
00
Base
SBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Education, California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of General Services (DGS), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Educational (125,000 SF)
Local Actions
Minor Master Plan Revision
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print