Integrated Science and Engineering Building Project

2 Documents in Project

Summary

SCH Number
2024070644
Lead Agency
California State University, San Marcos (CSUSM)
Document Title
Integrated Science and Engineering Building Project
Document Type
NOD - Notice of Determination
Received
Posted
12/3/2024
Document Description
CSUSM is proposing to construct an IS&E building project with a combined 125,000 square feet on a 2.46-acre site and an approximately 750-foot-long off-site utility tunnel on an additional 0.17 acre within the existing campus. The project would provide state of the art facilities for teaching, learning, and research, featuring integrative innovative technology and flexible configurations for classrooms and laboratories. The proposed project would require re-routing an existing service road and underground utilities. Other on-site improvements would include a loading dock and freight elevator, landscaping, exterior lighting, building and wayfinding signage, fire lane access, fire hydrants, and access for trash collection. The proposed project would be constructed in separate phases for a total duration of approximately 25 months. Once operational, the proposed project would support new College of Science, Technology, Engineering, and Mathematics undergraduate programs on campus. The proposed project is anticipated to result in approximately 350 new students (i.e., students not currently enrolled) and 33 new staff and faculty in the opening year.

Contact Information

Name
Michelle Alves
Agency Name
California State University, San Marcos
Job Title
Campus Planner
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Regions
Citywide
Cross Streets
Craven Road/Palm Canyon Drive and Campus View Drive/La Moree Road
Zip
92096
Total Acres
2.63
Jobs
33
Parcel #
221-67-002 and 221-67-003
State Highways
SR 78, I-15
Railways
SPRINTER
Airports
None
Schools
San Marcos Elementary and others
Waterways
San Marcos Creek, Discovery Lake, South Lake, Jack's Pond
Township
12S
Range
3W
Section
00
Base
SBM

Notice of Determination

Approving Agency
California State University, San Marcos
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print