SCH Number 2023050439
Project Info
- Title
- Anza Electric Cooperative (AEC) Electricity Transmission Line Project
- Description
- AEC’s existing land-based utilities systems in the project area consist of wooden utility poles, approximately 35 to 45 feet in height with single- or three-phase crossarm mounted distribution lines attached. The existing poles currently carry electric power distribution lines. The project includes replacement of approximately 3.1 miles of 34.5-kilovolt electricity transmission lines and construction of the Bautista Substation. The replacement transmission lines would be strung on the existing utilities poles. The proposed Bautista Substation would consist of electrical distribution facilities.
2 documents in project