Anza Electric Cooperative (AEC) Electricity Transmission Line Project

2 Documents in Project

Summary

SCH Number
2023050439
Lead Agency
Riverside County
Document Title
Anza Electric Cooperative (AEC) Electricity Transmission Line Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
public right-of-way/undeveloped
Document Description
AEC’s existing land-based utilities systems in the project area consist of wooden utility poles, approximately 35 to 45 feet in height with single- or three-phase crossarm mounted distribution lines attached. The existing poles currently carry electric power distribution lines. The project includes replacement of approximately 3.1 miles of 34.5-kilovolt electricity transmission lines and construction of the Bautista Substation. The replacement transmission lines would be strung on the existing utilities poles. The proposed Bautista Substation would consist of electrical distribution facilities.

Contact Information

Name
Kathleen Mitchell
Agency Name
County of Riverside
Job Title
Urban Planner
Contact Types
Lead/Public Agency

Name
Kevin Short
Agency Name
Anza Electric Cooperative
Job Title
General Manager
Contact Types
Project Applicant

Name
Annaliese Torres
Agency Name
Rincon Consultants, Inc.
Job Title
Senior Environmental Planner
Contact Types
Consulting Firm

Location

Cities
unincorporated
Counties
Riverside
Regions
Southern California, Unincorporated
Parcel #
see NOC attachment
State Highways
371
Schools
Hamilton High School
Waterways
various agricultural ditches and ponds

Notice of Completion

Development Types
Other (34.5 kV electricity transmission lines, 20 MVA substation)
Local Actions
Use Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.