Anza Electric Cooperative (AEC) Electricity Transmission Line Projec

2 Documents in Project

Summary

SCH Number
2023050439
Lead Agency
Riverside County
Document Title
Anza Electric Cooperative (AEC) Electricity Transmission Line Projec
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2023
Document Description
AEC’s existing land-based utilities systems in the project area consist of wooden utility poles, approximately 35 to 45 feet in height with single- or three-phase crossarm mounted distribution lines attached. The existing poles currently carry electric power distribution lines. The project includes replacement of approximately 3.1 miles of 34.5-kilovolt electricity transmission lines and construction of the Bautista Substation. The replacement transmission lines would be strung on the existing utilities poles. The proposed Bautista Substation would consist of electrical distribution facilities.

Contact Information

Name
Kathleen Mitchell
Agency Name
County of Riverside
Job Title
Urban Planner
Contact Types
Lead/Public Agency

Name
Kevin Short
Agency Name
Anza Electric Cooperative
Job Title
General Manager
Contact Types
Project Applicant / Parties Undertaking Project

Location

Cities
unincorporated
Counties
Riverside
Regions
Southern California, Unincorporated
Parcel #
see attachment
State Highways
371
Schools
Hamilton High School
Waterways
various agricultural ditches and ponds

Notice of Determination

Approving Agency
County of Riverside
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
Riverside County Planning Department, 4080 Lemon Street, 12th Floor, Riverside, CA 92501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print