SCH Number 2022090177
Project Info
- Title
- PHASE 2 MCHENRY SEWER LINE PROJECT
- Description
- The Project is the proposed installation of approximately 4,500 feet of 24" PVC sewer pipeline within existing street right-of-way and easements. The proposed Project will extend the City of Escalon sewer system to the existing Escalon Treatment Plant to the south, near McHenry Avenue immediately north of the Stanislaus River. The Project is intended to provide sewer services consistent with the City's approved Sewer Master Plan and General Plan. The Project will relocate and upsize a portion of the City’s sewer main currently located in McHenry Avenue paved right-of-way within City Limits of Escalon. The Project is a planned improvement that was evaluated in the approved General Plan and Sewer Master Plan for the City of Escalon. The need for the Project is based on future population growth projections in the City of Escalon as well as the anticipated changes in land use from the full buildout of the approved General Plan for the City. The McHenry Sewer Main will be bored and jacked, under a South San Joaquin Irrigation District Main Irrigation Canal and be installed via open trench construction under the existing Meyer Avenue asphalt roadway and County of San Joaquin Easement. The Meyers Avenue roadway surface is to be removed, and a new Meyers Avenue asphalt roadway will be constructed consistent with the City of Escalon’s engineering standards for street design in the original road location. Project implementation will require removal of approximately 49 almond trees located in the existing San Joaquin County Right-Of-Way.
2 documents in project