Phase 2 McHenry Sewer Line Project ISMND

2 Documents in Project

Summary

SCH Number
2022090177
Lead Agency
City of Escalon
Document Title
Phase 2 McHenry Sewer Line Project ISMND
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2022
Document Description
The purpose of this Project is to increase the City of Escalon’s sewer effluent pipeline capacity of the main sewer conveyance pipeline. The proposed Project will install approximately 4,500 feet of 24" PVC sewer line along McHenry Avenue and traverses to the west along Meyer Avenue, travelling south down an existing and abandoned Union Pacific railroad line (track, wooden ties, & ballast rock) that runs parallel to the proposed pipeline throughout this segment and beneath Greenleaf Road and the Main Irrigation Canal via jack and bore construction. This pipeline is the single conveyance pipeline that is proposed to be installed below existing ground surface between the City of Escalon southern City Limits and the Escalon Wastewater Treatment Plant, located 2 miles south of the City Limits. No impacts on historically significant resources are indicated in the CEQA Initial Study prepared for the Project. The Project will be installed within existing and proposed easements using open trench and bore and jack methods of construction. Except for removal of approximately 49 orchard trees that have been overplanted within the public right-of-way, no permanent above ground changes are proposed with the Project. The Project is not subject to a tree preservation ordinance. The City initiated outreach with the Native American Tribes Most Likely Descendent affiliated with the Project location pursuant to AB 52 on June 7, 2022. A response was received on June 20th, from the Northern Valley Yokuts Tribe and Nototomne Cultural Preservation requesting consultation under AB 52. Consultation ended on June 25th, 2022.easements using open trench and bore and jack methods of construction. Except for removal of approximately 49 orchard trees that have been overplanted within the public right-of-way, no permanent above ground changes are proposed with the Project. The Project is not subject to a tree preservation ordinance. The City initiated outreach with the Native American Tribes Most Likely Descendent affiliated with the Project location pursuant to AB 52 on June 7, 2022. A response was received on June 20th, from the Northern Valley Yokuts Tribe and Nototomne Cultural Preservation requesting consultation under AB 52. Consultation ended on June 25th, 2022. The public review period began on 9/8/2022 and ended on 10/10/2022

Contact Information

Name
Dominique Romo
Agency Name
City of Escalon
Job Title
City Planner
Contact Types
Lead/Public Agency

Location

Cities
Escalon
Counties
San Joaquin
Regions
Citywide
Cross Streets
McHenry Avenue and Meyers Avenue
Zip
95320
Total Acres
3.28 Temporary
Parcel #
NA
State Highways
California
Railways
BNSF
Airports
None
Schools
El Portal Middle School
Waterways
Stanislaus River and South San Joaquin Main Canal
Township
2South
Range
9 East
Section
17
Base
MtDiablo

Notice of Determination

Approving Agency
City of Escalon
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
Escalon City Hall 2060 McHenry Avenue Escalon, CA 95320 Contact: Dominique Romo, City Planner Email: dromo@cityofescalon.org

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print