PHASE 2 MCHENRY SEWER LINE PROJECT

2 Documents in Project

Summary

SCH Number
2022090177
Lead Agency
City of Escalon
Document Title
PHASE 2 MCHENRY SEWER LINE PROJECT
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Public Right-of-Way and Existing Easements
Document Description
The Project is the proposed installation of approximately 4,500 feet of 24" PVC sewer pipeline within existing street right-of-way and easements. The proposed Project will extend the City of Escalon sewer system to the existing Escalon Treatment Plant to the south, near McHenry Avenue immediately north of the Stanislaus River. The Project is intended to provide sewer services consistent with the City's approved Sewer Master Plan and General Plan. The Project will relocate and upsize a portion of the City’s sewer main currently located in McHenry Avenue paved right-of-way within City Limits of Escalon. The Project is a planned improvement that was evaluated in the approved General Plan and Sewer Master Plan for the City of Escalon. The need for the Project is based on future population growth projections in the City of Escalon as well as the anticipated changes in land use from the full buildout of the approved General Plan for the City. The McHenry Sewer Main will be bored and jacked, under a South San Joaquin Irrigation District Main Irrigation Canal and be installed via open trench construction under the existing Meyer Avenue asphalt roadway and County of San Joaquin Easement. The Meyers Avenue roadway surface is to be removed, and a new Meyers Avenue asphalt roadway will be constructed consistent with the City of Escalon’s engineering standards for street design in the original road location. Project implementation will require removal of approximately 49 almond trees located in the existing San Joaquin County Right-Of-Way.

Contact Information

Name
Lori Trottier
Agency Name
Ardurra
Job Title
Environmental Lead
Contact Types
Consulting Firm

Name
Dominique Romo
Agency Name
City of Escalon
Job Title
City Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Escalon
Counties
San Joaquin
Regions
Citywide
Cross Streets
McHenry Avenue at Meyers Road
Zip
95320
Total Acres
3.28ac Temporary
Parcel #
NA
State Highways
SR 108 and SR120
Railways
BNSF
Airports
NA
Schools
El Portel Middle School
Waterways
Stanislaus River and South San Joaquin Main Canal
Township
2 S.
Range
9 E.
Section
17
Base
MtDiablo

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Other (Sewer effluent conveyance)
Local Actions
Utility Relocation and Extension
Project Issues
Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Mandatory Findings of Significance, Noise
Local Review Period Start
Local Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print