SCH Number 2022050439
Project Info
- Title
- City of Parlier Flood Protection Project
- Description
- The proposed Project involves the upsizing of the existing stormwater collection system in the southeast area of the City of Parlier. This Project consists of the following: installing approximately 2,000 linear feet of larger-sized storm drains and manholes, installing a stormwater pump station at the Merced Stormwater Basin for redundancy, and deepening the east section of the existing Richard Flores Stormwater Basin. The Project consists the existing Richard Flores Stormwater Basin at the northeastern intersection of 1st Street and South Newmark Avenue (APN 355-192-14ST), the Merced Stormwater Basin located at the northeast intersection of Tuolumne Street and South Newmark Avenue, as well as along sections of J Street, Merced Street, K Street, and Tulare Street in the City of Parlier.
4 documents in project