City of Parlier Flood Protection Project
4 Documents in Project
Summary
SCH Number
2022050439
Lead Agency
City of Parlier
Document Title
City of Parlier Flood Protection Project
Document Type
NOD - Notice of Determination
Received
Posted
8/2/2022
Document Description
The proposed Project involves the upsizing of the existing stormwater collection system in the southeast area of the City of Parlier. This Project consists of the following: installing approximately 2,000 linear feet of larger-sized storm drains and manholes, installing a stormwater pump station at the Merced Stormwater Basin for redundancy, and deepening the east section of the existing Richard Flores Stormwater Basin.
Contact Information
Name
Jeffrey O'Neal
Agency Name
City of Parlier
Job Title
City Planner
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Email
Location
Cities
Parlier
Counties
Fresno
Regions
Citywide
Cross Streets
On J Street, Merced Street, and K Street
Zip
93648
Other Location Info
The proposed Project involves the upsizing of the existing stormwater collection system in the southeast area of the City of Parlier. This Project consists of the following: installing approximately 2,000 linear feet of larger-sized storm drains and manholes, installing a stormwater pump station at the Merced Stormwater Basin for redundancy, and deepening the east section of the existing Richard Flores
Stormwater Basin.
Notice of Determination
Approving Agency
City of Parlier
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
Parlier City Hall, 1100 E. Parlier Avenue, Parlier, CA 93648
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.