City of Parlier Flood Protection Project

4 Documents in Project

Summary

SCH Number
2022050439
Lead Agency
City of Parlier
Document Title
City of Parlier Flood Protection Project
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2024
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board is funding the Project referred to internally as the City of Parlier Flood Control and Groundwater Banking Project. The Project includes the upsizing of the existing Richard Flores stormwater retention basin and the connection of this basin to the Consolidated Irrigation District facilities with approximately 2,613 linear feet of underground pipelines, along with associated turnouts, pump stations, and metering facilities.

Contact Information

Name
Matthew Metelitz
Agency Name
State Water Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Sonia Hall
Agency Name
City of Parlier
Job Title
City Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Parlier
Counties
Fresno
Regions
Citywide
Cross Streets
1st Street and South Newmark Avenue
Zip
93648
Total Acres
+/-3.02
Parcel #
355-192-14ST
Schools
Cesar E Chavez Elementary
Township
15S
Range
22E
Section
24
Base
MDB&M
Other Location Info
The proposed Project involves the upsizing of the existing stormwater collection system in the southeast area of the City of Parlier. This Project consists of the following: installing approximately 2,000 linear feet of larger-sized storm drains and manholes, installing a stormwater pump station at the Merced Stormwater Basin for redundancy, and deepening the east section of the existing Richard Flores Stormwater Basin.

Notice of Determination

Approving Agency
State Water Board, Division of Financial Assistance
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
Records of the financing approval and an analysis of environmental alternatives for the Project are available to the general public upon request at the State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print