SCH Number 2022030533


Project Info

Title
CITY OF PARLIER FLOOD CONTROL AND GROUNDWATER BANKING PROJECT
Description
The proposed Project is a capital improvement project that proposes to convert the seven (7) existing stormwater retention basins listed below into groundwater recharge basins and connect those basins and an additional basin – eight basins total - to Consolidated Irrigation District (CID) facilities (open canals and buried pipelines) with approximately 7,800 linear feet (lf) of underground 48” diameter pipelines along with associated turnouts, pump stations, and metering facilities. The following is a list of all the basins with their approximate acreages and connecting CID facility: 1. Foothill Basin - 3.8 acres – Kingsburg Branch 2. Veterans Park Basin - 2.24 acres – Santa Fe Canal 3. Milton Basin - 3.34 acres – Kingsburg Branch 4. Industrial Basin - 3.1 acres – Kingsburg Branch 5. Tuolumne Basin - 3.99 acres – Santa Fe Canal 6. Avila Basin - 1.42 acres – Harp Ditch 7. Manning Basin - 1.51 acres – Harp Ditch The Richard Flores Basin (not listed above) is being improved as a separate project funded by the Proposition 68 Urban Flood Protection Grant Program; however, a new underground pipeline connection from the CID Harp Ditch to the Richard Flores Basin will be designed and constructed as part of this project.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Parlier City of Parlier Flood Control and Groundwater Banking Project
City of Parlier CITY OF PARLIER FLOOD CONTROL AND GROUNDWATER BANKING PROJECT