City of Parlier Flood Control and Groundwater Banking Project
3 Documents in Project
Summary
SCH Number
2022030533
Lead Agency
City of Parlier
Document Title
City of Parlier Flood Control and Groundwater Banking Project
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2024
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board is funding the Project referred to internally as the City of Parlier Flood Control and Groundwater Banking Project. The Project includes the conversion of the existing Manning Avenue stormwater retention basin into a groundwater recharge basin and the connection of this basin to the Consolidated Irrigation District facilities with approximately 2,613 linear feet of underground pipelines, along with associated turnouts, pump stations, and metering facilities.
Contact Information
Name
Matthew Metelitz
Agency Name
State Water Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Address
Phone
Name
Sonia Hall
Agency Name
City of Parlier
Job Title
City Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Email
Location
Cities
Parlier
Counties
Fresno
Regions
Citywide
Zip
93648
Total Acres
19.4
Schools
S. Ben Benavidez Elementary
Township
15S
Range
22E
Section
22-24
Base
MDB&M
Other Location Info
The Project is a capital improvement project that proposes to design and construct the conversion of the seven (7) existing stormwater retention basins listed below into groundwater recharge basins and connecting these basins and an additional basin – eight basins total - to Consolidated Irrigation District (CID) facilities (open canals and buried pipelines) with approximately 7,800 linear feet (lf) of buried 48” diameter pipelines, associated turnouts, pump stations, and metering facilities. The following is a list of all the basins with their approximate acreages and connecting CID facility: 1. Foothill Basin - 3.8 acres – Kingsburg Branch 2. Veterans Park Basin - 2.24 acres – Santa Fe Canal 3. Milton Basin - 3.34 acres – Kingsburg Branch 4. Industrial Basin - 3.1 acres – Kingsburg Branch 5. Tuolumne Basin - 3.99 acres – Santa Fe Canal 6. Avila Basin - 1.42 acres – Harp Ditch 7. Manning Basin - 1.51 acres – Harp Ditch
Notice of Determination
Approving Agency
State Water Board, Division of Financial Assistance
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
Records of the financing approval and an analysis of environmental alternatives for the Project are available to the general public upon request at the State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.