City of Parlier Flood Control and Groundwater Banking Project

2 Documents in Project

Summary

SCH Number
2022030533
Lead Agency
City of Parlier
Document Title
City of Parlier Flood Control and Groundwater Banking Project
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2022
Document Description
The Project is a capital improvement project that proposes to design and construct/convert seven existing stormwater retention basins into groundwater recharge basins and connecting these basins and an additional basin (Richard Flores) - eight basins total - to Consolidated Irrigation District (CID) facilities (using open canals and buried pipelines) with approximately 7,800 linear feet (If) of buried 48” diameter pipelines, associated turnouts, pump stations, and metering facilities.

Contact Information

Name
Sonia Hall
Agency Name
City of Parlier
Job Title
City Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Parlier
Counties
Fresno
Regions
Citywide
Other Location Info
The Project is a capital improvement project that proposes to design and construct the conversion of the seven (7) existing stormwater retention basins listed below into groundwater recharge basins and connecting these basins and an additional basin – eight basins total - to Consolidated Irrigation District (CID) facilities (open canals and buried pipelines) with approximately 7,800 linear feet (lf) of buried 48” diameter pipelines, associated turnouts, pump stations, and metering facilities. The following is a list of all the basins with their approximate acreages and connecting CID facility: 1. Foothill Basin - 3.8 acres – Kingsburg Branch 2. Veterans Park Basin - 2.24 acres – Santa Fe Canal 3. Milton Basin - 3.34 acres – Kingsburg Branch 4. Industrial Basin - 3.1 acres – Kingsburg Branch 5. Tuolumne Basin - 3.99 acres – Santa Fe Canal 6. Avila Basin - 1.42 acres – Harp Ditch 7. Manning Basin - 1.51 acres – Harp Ditch

Notice of Determination

Approving Agency
City of Parlier
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
1100 E Parlier Ave, Parlier, CA 93648

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print