SCH Number 2022030147
Project Info
- Title
- Group 3E Storm Drain PPA
- Description
- The proposed Capital Improvement Project would install an approximately 30-foot long segment of 18-inch diameter reinforced concrete pipe (RCP) storm drain and new 5-foot long by 5-foot curb long inlet. The storm drain trench would be at a depth of 5-7 feet and width of 3-4 feet, and would occur entirely within the developed right-of-way (ROW). An existing traffic signal conduit and loop detectors will be relocated. Any roadway impacted by trenching will be resurfaced.
3 documents in project