Group 3E Storm Drain PPA
3 Documents in Project
Summary
SCH Number
2022030147
Lead Agency
City of San Diego
Document Title
Group 3E Storm Drain PPA
Document Type
FIN - Final Document
Received
Present Land Use
Right of Way/RM-2-4 (Residential Multiple Unit) Zone
Document Description
The proposed Capital Improvement Project would install an approximately 30-foot long segment of 18-inch diameter reinforced concrete pipe (RCP) storm drain and new 5-foot long by 5-foot curb long inlet. The storm drain trench would be at a depth of 5-7 feet and width of 3-4 feet, and would occur entirely within the developed right-of-way (ROW). An existing traffic signal conduit and loop detectors will be relocated. Any roadway impacted by trenching will be resurfaced.
Contact Information
Name
Rhonda Benally
Agency Name
City of San Diego
Job Title
Associate Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
San Diego
Counties
San Diego
Regions
Citywide
Cross Streets
Nimitz Boulevard and West Point Loma Boulevard
Total Acres
Right of Way
Parcel #
Public Right-of-Way
State Highways
Interstate 8
Schools
Correia Middle School
Waterways
San Diego River
Notice of Completion
Development Types
Other (Capital Improvement Project)
Local Actions
Capital Improvement Project
Project Issues
Archaeological / Historical / Tribal Cultural Resources
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.