SCH Number 2021020513
Project Info
- Title
- Aratina Solar Project by 64NB 8ME LLC (8Minute Energy) Response to Comments
- Description
- The Aratina Solar Project, as proposed by 64NB 8ME, LLC (8Minute Energy), would develop a photovoltaic solar facility and associated infrastructure necessary to generate up to 530 megawatt-alternating current (MW-AC) of renewable energy, including up to 600 megawatts of energy storage, on privately-owned land in unincorporated Kern County. The proposed project consists of five separate sites (Sites 1 through 5) located on 22 parcels and totals approximately 2,554 acres; however, it is anticipated that approximately 2,317 acres will be utilized for the construction of the solar panels and permanent facilities. This document is Volume 7, Response to Comments, of the Final EIR.
7 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Kern County | Aratina Solar Farm Project by 64NB 8me LLC; 91MC, 8me LLC; 45MG 8me LLC; 104KB 8me LLC; 156KA 8me LLC (CESA Reissued Incidental Take Permit No. 2081 2020 022 04 | |
NOD | Kern County | Aratina Solar Farm Project by 64NB 8me LLC; 91MC, 8me LLC; 45MG 8me LLC; 104KB 8me LLC; 156KA 8me LLC (California Endangered Species Act Incidental Take Permit | |
NOD | Kern County | Aratina Solar Project by 64NB 8ME LLC (Streambed Alteration Agreement No. EPIMS-KER-25818-R4) | |
NOD | Kern County | Aratina Solar Project by 64NB 8ME LLC (8Minute Energy) | |
RC | Kern County | Aratina Solar Project by 64NB 8ME LLC (8Minute Energy) Response to Comments | |
EIR | Kern County | Aratina Solar Project by 64NB 8ME LLC (8Minute Energy) | |
NOP | Kern County | Aratina Solar Project 2.0 by 64NB 8ME LLC |