SCH Number 2020019085


Project Info

Title
Grand Island Levee Erosion Repair Project
Description
Reclamation District No. 3 plans to repair approximately 1,700 feet of levee to address critical erosion, bank loss, and waterside instability by placing rock, while restoring riparian habitat by establishing a waterside berm planted with native species. The Project will include placing rock on the waterside levee slope and reconstructing a section of the bank with a soil planting berm and rock containment berm. The Project will reestablish the authorized waterside levee slope geometry by replacing the bank and associated function that was part of the original federal levee.
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
Reclamation District No. 3 Grand Island Levee Erosion Repair (Streambed Alteration Agreement No. 1600-2020-0056-R3)
Reclamation District No. 3 Grand Island Levee Erosion Repair Project
Reclamation District No. 3 Grand Island Levee Erosion Repair Project
Reclamation District No. 3 Grand Island Levee Erosion Repair (Streambed Alteration Agreement No. 1600-2020-0056-R3)
Reclamation District No. 3 Grand Island Levee Erosion Repair Project