Grand Island Levee Erosion Repair Project

5 Documents in Project

Summary

SCH Number
2020019085
Lead Agency
Reclamation District No. 3
Document Title
Grand Island Levee Erosion Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2020
Present Land Use
Recreation
Document Description
Reclamation District No. 3 plans to repair approximately 1,700 feet of levee to address critical erosion, bank loss, and waterside instability by placing rock, while restoring riparian habitat by establishing a waterside berm planted with native species. The Project will include placing rock on the waterside levee slope and reconstructing a section of the bank with a soil planting berm and rock containment berm. The Project will reestablish the authorized waterside levee slope geometry by replacing the bank and associated function that was part of the original federal levee.

Contact Information

Name
Daniel Wilson
Agency Name
Reclamation District No. 3
Contact Types
Lead/Public Agency

Name
Agency Name
Reclamation District No. 3
Contact Types
Project Applicant

Location

Counties
Sacramento
Regions
Northern California
Cross Streets
Grand Island Road
Zip
95690
Parcel #
142-130-013; 142-130-008
State Highways
Nearest Highways are 160 & 220
Waterways
Steamboat Slough
Other Location Info
Grand Island, Sacramento-San Joaquin Delta, Sacramento County
Other Information
Between stations 562+00 and 579+00 (Levee Mile 10.78 and 11.02). See IS/MND page 2, Figure 1-1.

Notice of Determination

Approving Agency
Reclamation District No. 3 (Grand Island)
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print