SCH Number 2019049011


Project Info

Title
Diamond Regional Sewer Lin Station and Dual Force Mains Project
Description
The proposed project would replace the first phase of the existing B-Series Interceptor sewer system, to include the B1 Lift Station, Summerly Interim Lift Station, and Back Basin Groundwater Treatment Plant Lift Station. The project would collect raw wastewater and then pump the sewage through a parallel 24-inch-diameter and 16-inch-diameterforce mains to an existing junction structure near the corner of East Lakeshore Drive and Elm Street.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Elsinore Valley Municipal Water District Diamond Regional Sewer Lift Station and Dual Force Mains
Elsinore Valley Municipal Water District Diamond Regional Sewer Lift Station and Dual Force Mains Project
Elsinore Valley Municipal Water District Diamond Regional Sewer Lin Station and Dual Force Mains Project