Diamond Regional Sewer Lift Station and Dual Force Mains Project

2 Documents in Project

Summary

SCH Number
2019049011
Lead Agency
Elsinore Valley Municipal Water District
Document Title
Diamond Regional Sewer Lift Station and Dual Force Mains Project
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2019
Project Applicant
Elsinore Valley Municipal Water District (EVMWD)

Document Description
The proposed project involves the replacement of the first phase of the existing B-Series Interceptor sewer system, to include the existing B1 Lift Station, the Summerly Interim Lift Station, and Back Basin Groundwater Treatment Plant Lift Station. The project would collect.raw wastewater and then pump the sewage through a parallel 24-inch-diameter and 16-inch-diameter force mains to an .existingjunction structure near the corner of East Lakeshore Drive and Elm Street.

Contact Information
Jason Daffom
Elsinore Valley Municipal Water District
31315 Chaney Street
Lake Elsinore, CA 92530

Phone : (951) 674-3146

Location

Cities
Lake Elsinore
Counties
Riverside
Other Location Info
The-proposed project.is located south of East Lakeshore Drive, between the Diamond Drive and Malaga Road intersection on the east, Village Parkway on the south, and Lake Elsinore ,on the west, in the City of Lake Elsinore, California.

Notice of Determination

Approving Agency
Elsinore Valley Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Elsinore Valley Municipal Water District 31315 Chaney Street Lake Elsinore, CA 92530

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No