SCH Number 2018121015


Project Info

Title
San Joaquin Phase 2 Water System Improvements Project
Description
This is an addendum to the original MND. After filing the Notice of Determination, minor changes were made to the Project which included removing some additional pipelines that were not originally included in the 15/MND and adding some additional pipelines that were within the areas that were analyzed in the Project 15/MND. The analysis was consolidated under this Addendum. The Project will involve installing a new well (Well #6), a 71,000-gallon tank for backwash storage and sludge settling and associated filtration equipment, and various new or replacement pipelines in existing roadways to accommodate the Project. These infrastructure improvements will help the City reliably meet the maximum daily demand of 1,500 Gallons Per Minute (GPM) and the peak hour demand of 3,339 GPM.
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
City of San Joaquin San Joaquin Phase 2 Water System Improvement Project
City of San Joaquin San Joaquin Phase 2 Water System Improvement Project
City of San Joaquin San Joaquin Phase 2 Water System Improvements Project
City of San Joaquin San Joaquin Phase 2 Water System Improvements Project
City of San Joaquin San Joaquin Phase 2 Water System Improvements Project