San Joaquin Phase 2 Water System Improvement Project

5 Documents in Project

Summary

SCH Number
2018121015
Lead Agency
City of San Joaquin
Document Title
San Joaquin Phase 2 Water System Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2023
Document Description
The Project includes installation of a new well (Well #6), a 71,000-gallon tank for backwash storage and sludge settling and associated filtration equipment, approximately 2,300 linear feet of 10- inch diameter pipeline to convey raw groundwater from Well #4 to Well #6. The Project will also includes approximately 700 feet of 12-inch pipeline to connect Well #6 to the existing water distribution system, and approximately 400 feet of 6-inch sewer pipeline to connect the new well filtration system to the existing sewer system to dispose of manganese sludge.

Contact Information

Name
Kristal Kuo
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
San Joaquin
Counties
Fresno
Regions
Northern California
Zip
93660

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print