SCH Number 2018062071
Project Info
- Title
- Addendum to Certified Environmental Impact Report Newell Creek Dam Inlet/Outlet Replacement Project
- Description
- The proposed Project modifications consist of a change to the maximum discharge rate of the outlet structure with a control to be installed on the new outlet discharge sleeve valve to provide a revised maximum emergency release rate of 203 cubic feet per second (cfs). This represents an increase of approximately 39 cfs above the maximum emergency release rate of 164 cfs that was evaluated in the EIR. The change is necessary to allow the valve to initially facilitate releases greater than the required emergency release in order for the facility to continue to meet drawdown requirements even with some anticipated diminished capacity as the facility ages.
9 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Santa Cruz | Newell Creek Dam (NCD) Inlet-Outlet Replacement Project (Streambed Alteration Agreement No. 1600-2019-0050-R3) | |
NOD | City of Santa Cruz | Newell Creek Dam Inlet/Outlet Replacement Project Addendum to certified EIR | |
ADM | City of Santa Cruz | Addendum to Certified Environmental Impact Report Newell Creek Dam Inlet/Outlet Replacement Project | |
NOD | City of Santa Cruz | 4410010-002C | |
NOD | City of Santa Cruz | Newell Creek Dam Project | |
NOD | City of Santa Cruz | Newell Creek Dam (NCD) Inlet-Outlet Replacement Project (Streambed Alteration Agreement No. 1600-2019-0050-R3) | |
NOD | City of Santa Cruz | Newell Creek Dam Inlet Outlet Replacement Project | |
EIR | City of Santa Cruz | Newell Creek Dam Inlet/Outlet Replacement Project | |
NOP | City of Santa Cruz | Newell Creek Dam Inlet/Outlet Replacement Project |