4410010-002C
9 Documents in Project
Summary
SCH Number
2018062071
Lead Agency
City of Santa Cruz
Document Title
4410010-002C
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2020
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes replacement of the existing aging inlet/outlet works in new locations at the Newell Creek Dam and Loch Lomond Reservoir and other associated improvements. Primary components would include three new inlets located within the Reservoir to control and convey flows in and out of the Reservoir, a new outlet structure with valves and controls at the toe of the dam, a new dam seepage collection and monitoring system, a new 14- foot-diameter tunnel containing 48-inch and 10-inch inlet/outlet pipelines through the right (west) dam abutment and under the dam, a new control house on the dam crest to house controls for the inlets, replacement of an approximately 2,000-linear-foot section of Newell Creek Pipeline between the outlet structure and the first isolation valve, improvements along the dam's access roads, and decommission of the existing inlet/outlet works once the replacement system is operational.
Contact Information
Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Counties
Santa Cruz
Other Location Info
In the vicinity of Highway 9 and Loc Lomond Reservoir, Santa Cruz County
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.