Newell Creek Dam Inlet/Outlet Replacement Project Addendum to certified EIR

9 Documents in Project

Summary

SCH Number
2018062071
Lead Agency
City of Santa Cruz
Document Title
Newell Creek Dam Inlet/Outlet Replacement Project Addendum to certified EIR
Document Type
NOD - Notice of Determination
Received
Posted
7/2/2021
Document Description
The proposed Project modifications consist of a change to the maximum discharge rate of the outlet structure with a control to be installed on the new outlet discharge sleeve valve to provide a revised maximum emergency release rate of 203 cubic feet per second (cfs). This represents an increase of approximately 39 cfs above the maximum emergency release rate of 164 cfs that was evaluated in the EIR. The change is necessary to allow the valve to initially facilitate releases greater than the required emergency release in order for the facility to continue to meet drawdown requirements even with some anticipated diminished capacity as the facility ages.

Contact Information

Name
Sarah Easley Perez
Agency Name
Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Newell Creek Road
Zip
95018
Total Acres
518
Parcel #
076-251-24
State Highways
9
Waterways
Newell Creek, Loch Lomond Reservoir

Notice of Determination

Approving Agency
City of Santa Cruz
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
https://www.cityofsantacruz.com/government/city-departments/water/online-reports/environmental-documents

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to certified EIR)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print