SCH Number 2018052047
Project Info
- Title
- Cassel-Fall River Road Bridge Replacement
- Description
- The project entails replacing the existing Cassel-Fall River Rd Bridge over the Pit River with a new bridge located immediately south of the current bridge. The roadway approaches on both sides of the bridge would be shifted south. The western approach would require approx 390 ft of realignment and up to 60 ft of additional approach roadwork. The eastern approach would require approx 220 ft of realignment and up to 130 ft of additional approach work. An asphalt overlay would continue from the end of the eastern bridge approach roadway work for 370 ft toward the intersection of Dee Knoch Rd. An approx 165-ft long retaining wall would be placed on the south side of the eastern approach, east of the abutment.
3 documents in project