SCH Number 2018021014
Project Info
- Title
- Addendum to MND - Woodlake Sewer Improvements Project
- Description
- As discussed in the original IS/MND, the Project includes sewer improvements throughout the City. The improvements outlined in Figure 1 will implement capacity improvements, as well as repair and replacement of aging sewer system assets. The capacity improvements will be accomplished through upsizing existing lines, either through excavation and replacement with larger diameter lines or utilizing pipe bursting methods. In one instance, installation of a new, parallel trunk line will route flow that would otherwise exceed the capacity of an existing trunk sewer located in Valencia Street. In addition to the capacity improvements, the City plans to repair or replace aging infrastructure that is close to the end of its useful life. Changes to Project Description - The final design of the original sewer improvement project was finalized, and it was decided that a different alignment would serve the City more efficiently. There are approximately 1.3 miles of new sewer alignment that were not analyzed in the original MND, as provided in Figure 2. The 1.3 miles of new alignment is the subject of the environmental analysis contained in this Addendum.
4 documents in project