The City of Woodlake Sewer Improvements

4 Documents in Project

Summary

SCH Number
2018021014
Lead Agency
City of Woodlake
Document Title
The City of Woodlake Sewer Improvements
Document Type
NOD - Notice of Determination
Received
Posted
3/9/2021
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Clean Water State Revolving Fund (SRF) Program is financing the Project. The Project consists of sewer pipeline upgrades to address capacity and condition deficiencies through a combination of repair and replacement projects throughout the City’s collection system. The Project will implement capacity improvements, as well as repair and replace aging infrastructure that is close to the end of its useful life. The capacity improvements will be accomplished through upsizing existing lines, either through excavation and replacement with larger diameter lines or utilizing pipe bursting methods.

Contact Information

Name
Kristen Way
Agency Name
State Water Resources Control Board
Contact Types
Responsible Agency

Location

Cities
Woodlake
Counties
Tulare
Other Location Info
The Project is located in the City of Woodlake, CA. The City is located in the northeast corner of Tulare County (Township 17 South, Range 27 East, and Sections 25, 30, 26, and 31) at an elevation of 440 feet (134 meters) above mean sea level. The City is approximately 75 miles north of Bakersfield, CA at the base of the Sierra Nevada Mountain Range in the San Joaquin Valley.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
A record of financing approval for the Project is available to the general public at the State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print