SCH Number 2017091076


Project Info

Title
Asilomar Boulevard Stabilization Project
Description
The proposed project would seek to limit major earthwork and construction activity on the slope south of the Asilomar Blvd ROW. Using a construction method called Cement-Deep Soil Mixing, work within the ROW would occur using a specialized drill rig that would mix the existing subsurface material with cement, forming approx 2 to 8 ft wide columns, depending on final design, up to a depth of approx 120 ft, which would strengthen the subsurface material and stabilize the slide area of teh roadway. The CDSM columns would be installed in a grid pattern located entirely within an approx 600-ft long by 50 ft wide portion of the Asilomar Blvd ROW between Almar Ave and Wynola St. Following construction, the project site would appear similar to existing conditions.
Download CSV New Search

 

2 documents in project

Type Lead Agency Received Title
City of Los Angeles Asilomar Boulevard Stabilization Project
City of Los Angeles Asilomar Boulevard Landslide Mitigation Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.