Asilomar Boulevard Stabilization

3 Documents in Project

Summary

SCH Number
2017091076
Lead Agency
City of Los Angeles
Document Title
Asilomar Boulevard Stabilization
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2021
Document Description
The Asilomar Boulevard Landslide is an active landslide located on the south-facing slope below the Asilomar Boulevard right-of-way between Almar Avenue and Wynola Street in the Pacific Palisades community of the City of Los Angeles (City). The Project will construct a geo-technically stable roadway across the top of the landslide to prevent further sliding of the block beneath Asilomar Boulevard, between Almar Avenue and Wynola Street. Work within the right-of-way will occur using a specialized drill rig that will mix the existing subsurface material with cement, forming columns up to a depth of approximately 120 feet, which will strengthen the subsurface material and stabilize the slide area beneath the roadway. Following construction, the Project site's physiography will appear similar or virtually identical to the existing conditions, as all of the columns will be installed below the ground surface. The Project will also maintain the natural look of the existing slope, south of Asilomar Boulevard. The Project site is within the California Coastal Zone, under the dual jurisdiction of both the California Coastal Commission, and the City Engineer.

Contact Information

Name
Eileen Schoetzow
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Citywide
Cross Streets
Almar Avenue and Wyola Street
Zip
90272

Notice of Determination

Approving Agency
Los Angeles City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Public Works Building Bureau of Engineering | Environmental Management Group 1149 S. Broadway Ave., 6th Floor Los Angeles, CA. 90015

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print