SCH Number 2017082044


Project Info

Title
City of Antioch Brackish Water Desalination Project
Description
The proposed project consists of the construction of a desalination facility at the city's WTP with the capacity to produce up to 6 mgd of finished water; demolition of the existing San Joaquin River intake pump station; construction of a new intake pump station; approx 3,000 ft of pipeline from the existing raw water pipeline underneath Long Tree Way to the city's WTP to allow a direct connection to max use of existing infrastructure; and approx 4 mi of pipeline from the desalination facility to the Delta Diablo WTP to discharge brine with the WWTP effluent through the existing Delta Diablo outfall to New York Slough. The main objectives of the proposed project are to improve water supply reliability and water quality for its customers; develop a reliable and drought-resistance water source to reduce dependency on purchased water supplies; maximize and preserve the use of the city's pre-1914 water rights; and provide cost effective operational flexibility for the city.
Download CSV New Search

 

8 documents in project

Type Lead/Public Agency Received Title
City of Antioch DWSRF NOD
City of Antioch City of Antioch Brackish Water Desalination Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2019-046-03 (ITP)]
Regional Water Quality Control Board, Region 5 (Central Valley) City of Antioch Brackish Water Desalination Project
California Department of Water Resources (DWR) Brackish Water Desalination Facility
City of Antioch Brackish Water Desalination Project
City of Antioch City of Antioch Brackish Water Desalination Project
City of Antioch City of Antioch Brackish Water Desalination Project
City of Antioch Brackish Water Desalination Project