Brackish Water Desalination Project

8 Documents in Project

Summary

SCH Number
2017082044
Lead Agency
City of Antioch
Document Title
Brackish Water Desalination Project
Document Type
NOD - Notice of Determination
Received
Posted
1/22/2019
Present Land Use
Open Space, Neighborhood Commercial, Medium Low Density Residential
Document Description
The proposed project consists of the construction of a desalination facility at the city's WTP with the capacity to produce up to 6 mgd of finished water; demolition of the existing San Joaquin River intake pump station; construction of a new intake pump station; approx 3,000 ft of pipeline from the existing raw water pipeline underneath Long Tree Way to the city's WTP to allow a direct connection to max use of existing infrastructure; and approx 4 mi of pipeline from the desalination facility to the Delta Diablo WTP to discharge brine with the WWTP effluent through the existing Delta Diablo outfall to New York Slough. The main objectives of the proposed project are to improve water supply reliability and water quality for its customers; develop a reliable and drought-resistance water source to reduce dependency on purchased water supplies; maximize and preserve the use of the city's pre-1914 water rights; and provide cost effective operational flexibility for the city.

Contact Information

Name
Scott Buenting
Agency Name
City of Antioch
Contact Types
Lead/Public Agency

Location

Cities
Antioch, Pittsburg
Counties
Contra Costa
Cross Streets
Putnam Street between D Street, G Street, McElheny Road, Fulton Shipyard Road,Pittsburg-Antioch
Zip
94509
Parcel #
Varies
State Highways
4
Railways
Amtrak
Airports
No
Schools
Multiple
Waterways
San Joaquin River
Township
2N
Range
1E
Section
25
Base
MDB&M

Notice of Determination

Approving Agency
City of Antioch
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print