SCH Number 2017012062


Project Info

Title
Bacon Island Levee Rehabilitation Project
Description
Reclamation district no. 2028 plans to rehabilitate a portion of the Bacon Island levee system, 4.7 miles in length, to a sustainable Hazard Mitigation Plan standard. The proposed project includes landside and waterside work. Landside work involves raising the levee crown and stabilizing the slope and toe berm. There will be a new all-weather road built along the levee crown. Waterside work involves erosion repair and improving waterside bank protection (rock revetment) for erosion control along most of the project area.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Bacon Island Reclamation District 2028 Bacon Island Levee Rehabilitation Project (Lake or Streambed Alteration Agreement No. 1600-2018- 0046-R3)
Bacon Island Reclamation District 2028 Bacon Island Levee Rehabilitation Project
Bacon Island Reclamation District 2028 IS/MND Bacon Island Levee Rehabilitation Project located along Old River
Bacon Island Reclamation District 2028 Bacon Island Levee Rehabilitation Project