IS/MND Bacon Island Levee Rehabilitation Project located along Old River

4 Documents in Project

Summary

SCH Number
2017012062
Lead Agency
Bacon Island Reclamation District 2028
Document Title
IS/MND Bacon Island Levee Rehabilitation Project located along Old River
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2017
Present Land Use
Ag
Document Description
Project includes landside and minor waterside work entirely above Mean High Water. Landside work involves raising the levee crown and stabilizing the slope of placing fill material on the levee toe, slope, and crown. Aggregate base will be placed on the levee crown to create an all-weather roadway. Waterside work involves armoring newly placed fill along the waterside of the levee. The project will compensate for future settlement of the peat foundation as well as sea level rise and ensure a sustainable HMP cross-section standard by incorporating the recommended design cross section, which includes a toe berm and a wider levee crown.

Contact Information

Name
Dave Forkel
Agency Name
Reclamation District No. 2028
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
nearest Bacon Island Rd and W. Lower Jones Rd
Zip
95219
Parcel #
12905024-027, 052, 056, 060, 019, 018
Railways
Burlington N. Santa Fe
Waterways
Old River
Township
1,2
Range
4
Section
5,6,30

Notice of Determination

Approving Agency
Reclamation District No. 2028, Bacon Island
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes