SCH Number 2016121033


Project Info

Title
Bradley Road Bridge
Description
The city is proposing to replace this low-flow crossing with an all-weather crossing (bridge), effectively raising the roadway out of the floodplain. The total area of potential disturbance is approximately 4.39 acres. The limits of work include temporary siting and disturbance areas. Construction is estimated to begin in March 2017 and last approximately 18 months.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Menifee Bradley Road Bridge Project
City of Menifee Bradley Road Bridge Project (Lake or Streambed Alteration Agreement No. EPIMS-RIV-40173-R6)
City of Menifee Bradley Road Bridge