SCH Number 2016061031
Project Info
- Title
- Santa Margarita Ecological Reserve Solar Project
- Description
- The project proposes construction and operation of a solar energy generation facility on approximately 15 acres of land located within the SMER. The project would be installed over an approximately six-month construction phase. Operation is planned for a period of approximately 20 years, and then the facilities would be removed and the site would be restored with native habitat when the center is decommissioned and removed. The proposed project is anticipated to generate 6,900,000 kWh of power per year. The proposed project would use conventional polycrystalline photovoltaic modules with an anti-reflective surface. Generated electricity would be connected to the energy grid via an existing Southern California Edison distribution line that runs along the eastern site boundary.
2 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | California State University Board of Trustees | San Diego State University, San Diego; Approve the Schematic Design for the Santa Margarita Ecological Reserve Solar Project | |
MND | California State University Board of Trustees | Santa Margarita Ecological Reserve Solar Project |