San Diego State University, San Diego; Approve the Schematic Design for the Santa Margarita Ecological Reserve Solar Project

2 Documents in Project

Summary

SCH Number
2016061031
Lead Agency
California State University Board of Trustees
Document Title
San Diego State University, San Diego; Approve the Schematic Design for the Santa Margarita Ecological Reserve Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
2/23/2017
Present Land Use
GPD: Open space Z: Open space conservation santa margarita
Document Description
The project proposes construction and operation of a solar energy generation facility on approximately 15 acres of land located within the SMER. The project would be installed over an approximately six-month construction phase. Operation is planned for a period of approximately 20 years, and then the facilities would be removed and the site would be restored with native habitat when the center is decommissioned and removed. The proposed project is anticipated to generate 6,900,000 kWh of power per year. The proposed project would use conventional polycrystalline photovoltaic modules with an anti-reflective surface. Generated electricity would be connected to the energy grid via an existing Southern California Edison distribution line that runs along the eastern site boundary.

Contact Information

Name
Laura V. Shinn
Agency Name
California State University Board of Trustees
Contact Types
Lead/Public Agency

Location

Cities
Temecula
Counties
Riverside
Cross Streets
Via Santa Rosa and Via Tornado
Zip
92590
Total Acres
17.9
Parcel #
918080001, 918050009, 918070008
State Highways
I-15, SR 79
Schools
Hillcrest Academy
Waterways
Santa Margarita River
Township
8S
Range
3W
Section
26

Notice of Determination

Approving Agency
San Diego State University
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print