SCH Number 2014091014


Project Info

Title
ENV-2014-1352-MND / 380 East Pershing Drive
Description
On June 27, 2012 AES Southland, LLC submitted an Application for Certification (AFC) for the Huntington Beach Energy Project (HBEP). On Oct. 29, 2014, the Energy Commission approved the AFC for HBEP with a Final Decision. On Sept. 14, 2015, AES Southland LLC submitted a petition to amend (PTA) to the Energy Commission to modify the Final Decision. HBEP, as amended (12-AFC-02C), would replace, and be constructed on, 28.6 acres entirely within the footprint of the existing and operating AES Huntington Beach Generating Station (HBGS) located in an industrial area of Huntington Beach, CA. The redesigned project would total 844 megwatts and be constructed in two phases. Phase 1 would be a natural gas-fired, combined cycle, air cooled, 644 MW electrical generating facility. Phase 2 would be two 100-MW simple-cycle gas turbines. No new offsite linear facilities are proposed as part of this project.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Los Angeles Huntington Beach Energy Project - Petition to Amend
City of Los Angeles ENV-2014-1352-MND / 380 East Pershing Drive