SCH Number 2014081078


Project Info

Title
Fresno Recycled Water Distribution System Southwest Quadrant
Description
Note: Review Per Lead The city is proposing several changes to the recycled water distribution pipeline alignment and pump station proposed in the city of Fresno's Southwest Quadrant. In total, the revised pipeline alignment would result in a reduction of approx 1,600 ft of pipeline from what was previously analyzed in the Tiered MND. When compared to the original pipeline length analyzed of approx 22 miles, a decrease of 1,600 ft would result in a 1.38% decrease in overall pipeline length. In addition, the proposed pump station would be relocated to a nearby location. The changes are described in detail in the Addendum to the Tiered MND.
Download CSV New Search

 

9 documents in project

Type Lead/Public Agency Received Title
City of Fresno Recycled Water Distribution System, Southwest Quadrant Addendum #3 to the Tiered Mitigated NEgative Declaration
City of Fresno Recycled Water Distribution System, Southwest Quadrant
City of Fresno Recycled Water Distribution System, Southwest Quadrant
City of Fresno Fresno Recycled Water Distribution System Southwest Quadrant
City of Fresno Fresno Recycled Water Distribution System Addendum to Tiered MND
City of Fresno Fresno Recycled Water Distribution System
City of Fresno Recycled Water Distribution System, Southwest Quadrant (Project);
City of Fresno City of Fresno Environmental Assessment (EA) No. 14-026, prepared for the City of Fresno Recycled Water Distribution System (Southwest Phase)
City of Fresno Recycled Water Distribution System, Southwest Quadrant (Project);