Recycled Water Distribution System, Southwest Quadrant

8 Documents in Project

Summary

SCH Number
2014081078
Lead Agency
Fresno, City of (City of Fresno)
Document Title
Recycled Water Distribution System, Southwest Quadrant
Document Type
NOD - Notice of Determination
Received
Posted
6/18/2019

Document Description
The City is proposing modifications to the previously approved recycled water distribution pipeline alignment as analyzed in the Recycled Water Distribution System, Southwest Quadrant Tiered Mitigated Negative Declaration (MND). In total, the refined pipeline alignments would result in an addition of approximately 4 miles of pipeline. The Tiered MND analyzed approximately 22 miles of pipeline which was reduced by approximately 1,600 feet with the revisions analyzed in the 2017 Addendum, Therefore, when compared to the original pipeline length analyzed of approximately 22 miles, and the reduction of I ,600 feet as part of the 2017 Addendum, an increase of 4 miles as part of this Addendum would result in a net increase of 3.70 miles or a 16.82 percent increase in overall pipeline length from the Tiered MND. The following describes the changes in detail. See NOD for full details.

Contact Information
Patricia Diep
City of Fresno Department of Public Utilities
Utilities, Planning, and Engineering 2101 G Street, Building A
Fresno, CA 93706

Phone : (559) 621-1609

Location

Cities
Fresno
Counties
Fresno

Notice of Determination

Approving Agency
City of Fresno
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Fresno Development and Resource Management Department, 2600 Fresno Street, Room 3043, Fresno, California 93721-3604.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2014081078   PDF 1291 K