SCH Number 2014021042


Project Info

Title
Tehachapi East Afterbay Turnout Pump Station Project
Description
AVEKWA desires to install all facilities required to render the turnout operational through additional construction within and beyond DWR's right of way at Milepost 1.30 of the West Branch. These facilities include a reinforced concrete metering vault structure, a water meter, a 24-inch diameter steel discharge pipe, a 12' x 20' control building, a 12' x 12' transformer pad and tower, safety devices, stoplogs, pumps, a pipe manifold system from the turnout structure to the discharge pipe, electrical facilities, control systems and other related appurtenances.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Antelope Valley-East Kern Water Agency (AVEK) Agreement Between the Department of Water Resources of the State of California and Antelope Valley-East Kern Water Agency for Construction, Operation and Mainte
Antelope Valley-East Kern Water Agency (AVEK) Tehachapi East Afterbay Turnout Pump Station Project
Antelope Valley-East Kern Water Agency (AVEK) Tehachapi East Afterbay Turnout Pump Station Project