Agreement Between the Department of Water Resources of the State of California and Antelope Valley-East Kern Water Agency for Construction, Operation and Mainte

3 Documents in Project

Summary

SCH Number
2014021042
Lead Agency
Antelope Valley-East Kern Water Agency
Document Title
Agreement Between the Department of Water Resources of the State of California and Antelope Valley-East Kern Water Agency for Construction, Operation and Mainte
Document Type
NOD - Notice of Determination
Received

Document Description
AVEKWA desires to install all facilities required to render the turnout operational through additional construction within and beyond DWR's right of way at Milepost 1.30 of the West Branch. These facilities include a reinforced concrete metering vault structure, a water meter, a 24-inch diameter steel discharge pipe, a 12' x 20' control building, a 12' x 12' transformer pad and tower, safety devices, stoplogs, pumps, a pipe manifold system from the turnout structure to the discharge pipe, electrical facilities, control systems and other related appurtenances.

Contact Information
Craig Trombly
Department of Water Resources
1416 9th Street
Sacramento, CA 95814

916-653-4547

Location

Coordinates
34°48'49"N 118°43'07"W
Cities
Gorman
Counties
Los Angeles
Cross Streets
None
Zip
93536
Total Acres
1
Parcel #
3253-001-902
State Highways
Hwy 138
Railways
No
Airports
No
Schools
No
Waterways
CA Aqueduct
Township
8N
Range
17W
Section
6
Base
SBB&M

Notice of Determination

Approving Agency
DWR
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Department of Water Resources State Water Project Analysis Office 1416 9th Street Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search