SCH Number 2013031077


Project Info

Title
Edinger Avenue Bridge Over Bolsa Chica Channel Replacement Project
Description
The Project is limited to the demolition and replacement of the Edinger Avenue Bridge over Bolsa Chica Channel. The existing 15-span bridge will be removed then replaced with a 4-span bridge. The Project will increase the bridge width from 30 feet to 48.5. The bridge profile will be raised 5.9 higher than the existing bridge. The length of the bridge span will increase from 300 feet to 340 feet. Rock will be deposited into the stream to provide bank protection, bridge abutment protection, and to fill and protect an existing scour hole at the bridge location.
Download CSV New Search

 

3 documents in project

Type Lead Agency Received Title
Orange County Edinger Avenue Bridge Over Bolsa Chica Channel Replacement Project
Orange County Edinger Avenue Bridge Over Bolsa Chica Channel Replacement Project
Orange County Edinger Avenue Bridge Over Bolsa Chica Channel Replacement Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.