SCH Number 2012092004


Project Info

Title
Crystal Springs County Sanitation District Wastewater Collection System Improvements MND/IS
Description
The Project proposes to replace existing sanitary sewer pipes in specific areas of the Crystal Springs County Sanitation District using primarily the pipe bursting construction method. In most locations, 6 inch vitrified clay pipes will be replaced with 6 inch high density polyethylene pipes. However , in some locations where 8 inch pipe exists downstream of the segments to be replaced, the 6 inch pipes will be upsized to 8 inch pipes. After pipe replacement, existing laterals along the pipe alignment will be re-connected to the new pipe. Existing brike manholes will also be replaced with concrete manholes.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
San Mateo County Crystal Springs County Sanitation District Wastewater Collection System Improvements MND/IS
San Mateo County Crystal Springs County Sanitation District Wastewater Collection System Improvements MND/IS
San Mateo County Crystal Springs County Sanitation District Wastewater Collection System Improvements MND/IS