SCH Number 2012021052
Project Info
- Title
- Construction of a Stormwater Retention Basin Near Herndon and DeWolf Avenues (Pup Creek Basin), Channel Re-Alignment and Culvert Replacement
- Description
- Construction of a storm water retention basin south of the Enterprise Canal at Pup Creek. The basin design will provide 200 acre-feet of storage for storm water. The culverts on Pup Creek that go under the Enterprise Canal will be replaced to increase capacity and prevent water from overtopping the Enterprise Canal banks and potential flooding downstream. Pup Creek will be re-routed to flow across the basin site to a control structure at the south of the property.
2 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Fresno Metropolitan Flood Control District | Construction of a Stormwater Retention Basin Near Herndon and DeWolf Avenues (Pup Creek Basin), Channel Re-Alignment and Culvert Replacement | |
MND | Fresno Metropolitan Flood Control District | Construction of a Stormwater Retention Basin Near Herndon and DeWolf Avenues (Pup Creek Basin), Channel Re-Alignment and Culvert Replacement |